Q-2, r. 1.1 - Regulation respecting oil-fired heating appliances

Full text
9. Any person who replaces, in a residential building, a boiler, furnace or water heater powered in whole or in part by oil with an appliance powered by a different form of energy must, within 30 working days after the replacement, send electronically to the Minister a declaration containing
(1)  their name, address and telephone number;
(2)  if applicable, the number of the licence issued to them under the Building Act (chapter B-1.1);
(3)  in respect of each appliance installed to replace another appliance powered in whole or in part by oil,
(a)  the name, address and telephone number of the owner of the building where the appliance is located;
(b)  the address of the building where the appliance is located;
(c)  the date of installation; and
(d)  the type and form of energy powering the appliance; and
(4)  a description of the procedure followed when removing the tank that supplied fuel to the appliance that was replaced, if applicable.
O.C. 1412-2021, s. 9.
In force: 2021-12-31
9. Any person who replaces, in a residential building, a boiler, furnace or water heater powered in whole or in part by oil with an appliance powered by a different form of energy must, within 30 working days after the replacement, send electronically to the Minister a declaration containing
(1)  their name, address and telephone number;
(2)  if applicable, the number of the licence issued to them under the Building Act (chapter B-1.1);
(3)  in respect of each appliance installed to replace another appliance powered in whole or in part by oil,
(a)  the name, address and telephone number of the owner of the building where the appliance is located;
(b)  the address of the building where the appliance is located;
(c)  the date of installation; and
(d)  the type and form of energy powering the appliance; and
(4)  a description of the procedure followed when removing the tank that supplied fuel to the appliance that was replaced, if applicable.
O.C. 1412-2021, s. 9.